Unit Development Assistance

After deciding the issues of product and process, the next important question is where to set the unit up? For many tiny units and service-based units, the home is perhaps the best starting point.Setting up an establishment is much more than putting a signboard up and waiting for customers to walk in. It requires negotiating a favourable plot or shed purchase, organising for proper construction of building, design of interiors and finding good deals for equipment and machinery.

(1). Construction of Building

Once an industrial plot for the unit is secured, then the next job is that of finding a suitable architect. Design of factory building has to be in consonance with the type of industry and have an appropriate plant layout. An architect's estimate of building construction is essential for loan applications. Further, architect's certificate for money spent on building is needed for disbursement of loan.

(2). Getting the Utility Connections

Among the utilities of prime importance are power and water. In many cases getting power connection causes delay in setting up of plant. Therefore it is imperative to commence work on these aspects with diligent follow up. Power connections are generally of either LT (Low Tension) or HT (High-tension) type. If connected load is upto 75 HP, LT connection is provided. For connected loads of 130 HP or higher only HT connection is provided. A formal application needs to be made in a specified form to the state electricity board. An electrical inspector is deputed for evaluation of application to factory site, after which the load is sanctioned. In areas of power shortage, it is advisable to augment the power supply with a captive generating set. Water connection is also obtained likewise by applying in advance in formal forms. The water supply can be augmented by installation of tubewell.

(3). Getting 3M's Right

(4). Men

Projections for manpower and staffing are made in the project report. However it is necessary to time the induction of manpower in a planned manner. The engineers and operatives must be available before the installation of the machinery.

(5). Materials

Materials procurement and planning are critical to success, of a start-up with a MSME unit. Inventory management can lead to manageable cash flow situations; otherwise if too much is ordered too soon considerable amount of working capital gets locked up. On the other hand, non-availability may result in production hold-ups, and idle machine and manpower. For essential imported raw material whose lead-time is large proper planning is all the more essential.